U.S. Customs and Border Protection
and other detection technology. CBPs Smart Wall Map provides details on the status and locations of border barrier along the Southwest border to include barriers constructed prior to January 20, 2025, such as cameras, and the technology required to tie it all together, in addition to where new Smart Wall is being planned for construction, 2025. This information will be updated weekly as construction progresses. Visit the Smart Wall FAQs page Click and zoom on the map to see more information about the Smart Wall CBP is using the following to define the Smart Wall status: Planned Represents the total mileage planned/funded for construction but the contracts have not yet been awarded. Awarded Represents contracts that have been awarded,954 miles Existing Primary Wall (prior to 1/20/2025 that met U.S. Border Patrol operational requirements): ~644 miles Primary Wall ~75 miles of Secondary Wall Barrier TypeExecuting AgencyPlanned (not yet awarded)Awarded (Design Phase)Under ConstructionCompletedTotalEnd State Primary Smart Wall (New) CBP 0 342.8 245.8 40.7 629 1。
which includes a combination of primary and secondary steel bollard wall。
U.S. Customs and Border Protections Smart Wall Map is an interactive map designed to depict the status of border barriers along the 1, waterborne barriers, including locations on the map, patrol roads, or a Smart Wall,419 miles * Department of War - - 1.5 4.5 6 Primary Smart Wall (Replacement) CBP 62 3.8 41.6 17.6 125 Department of War - - - 15.2 15 Waterborne Barrier System CBP 0 408.2 111.6 15.8 536 536 miles Secondary Border Wall CBP 62 365.0 181.5 23.4 632 708 miles Vehicle Barrier CBP 0 174 0 0 174 - * Approximately 535 miles of the U.S. - Mexico border without barrier will be covered by detection technology due to unfavorable terrain or remoteness of location. CBP is also deploying approximately 549 miles of technology in locations with previously constructed barrier. The mileages above, already under construction or has been completed since January 20。
and the project is in the design phase or early construction activities have begun. Under Construction Represents projects where border wall panels or waterborne barrier is currently being constructed/deployed. Completed Represents the total mileage that has been completed since 1/20/2025. U.S. - Mexico Border - 1,954-mile border between the U.S. and Mexico. CBP is utilizing funds from the One Big Beautiful Bill Act (H.R. 1) to construct a border barrier system, lights,。
may vary due to rounding and may change slightly as the projects are finalized and contracts are awarded. 。
评论列表